Monday, 6 January 2014

2008 Mazda CX-9 Accelerator Pedal Vibration

2008 Mazda CX-9 Accelerator Pedal Vibration
download
Some vehicles may exhibit accelerator pedal vibration around 1750-2000 engine RPMs, regardless of speed. The vibration may also be felt at the brake pedal and steering wheel. On vehicles built after February 21, 2008, the No.2 dynamic chamber stay (bracket) was deleted on all production vehicles. The absence of the No.2 stay can cause pedal vibration. This procedure details installation of the No. 2 stay. The No. 2 dynamic chamber stay components required are the stay (1), the top fastener (2) and the bottom fastener (3). Customers having this concern should have their vehicle repaired using the following repair procedure. REPAIR PROCEDURE 1. Verify customer concern. 2. Record customer radio station presets. 3. Remove negative battery cable. 4. Remove engine cover. Refer to Workshop Manual section 01-10 ENGINE COVER REMOVAL/INSTALLATION [MZI-3.7].
5. Remove the air cleaner cover and resonance chamber. Disconnect the MAF/IAT sensor connector. Refer to Workshop Manual section 01-13 INTAKE-AIR SYSTEM REMOVAL / INSTALLATION [3.7L]. 6. Remove dynamic chamber assembly (upper intake manifold). Refer to Workshop Manual section 01-13 INTAKE-AIR SYSTEM REMOVAL / INSTALLATION [3.7L]. a. Remove one 8mm fastener from No.1 stay (just underneath throttle body) b. Remove three (3) harness clips from dynamic chamber using body removal tool (or equivalent). c. Remove six (6) 8mm bolts from dynamic chamber. NOTE: • When removing dynamic chamber assembly, leave back hose connected and position out of the way. Remove purge valve from mounting bracket to provide additional room to work. • 7. Remove two (2) 8mm bolts (A) and loosen one (1) 8mm bolt (B) from the rear exhaust manifold insulator (heat shield) as shown.
Refer to Workshop Manual section 01-15 EXHAUST SYSTEM REMOVAL / INSTALLATION [3.7L]. NOTE: • An inspection mirror may be helpful to see the bolts. 8. Reposition the heat shield (D) to gain access for No. 2 stay bottom fastener installation. 9. Install bottom fastener (C). Start threads but do not tighten the fastener at this time. NOTE: • Apply Loctite # 272 to bottom fastener threads before installation. 10. Install the No. 2 stay so that slotted side of the stay is placed on top of the bottom fastener installed in the previous step. Do not tighten the fastener at this time. 11. Check that all dynamic chamber gaskets are in place and mounting surfaces are clean. 12. Place dynamic chamber onto the lower intake manifold. 13. Install top fastener through the top bolt hole of the No.2 stay but do not tighten at this time. This will align the No.2 stay properly.

1 comment:

  1. Thanks for sharing the information

    For more info : Halt Hass Chamber

    ReplyDelete